Jump to content

Line 7 (Suzhou Rail Transit)

From Wikipedia, the free encyclopedia
Line 7
Line 7 Under Construction at Tongyuanlu South station
Overview
StatusUnder construction
(Hongzhuang to Muli is operational as the branch of Line 4)
OwnerSuzhou Rail Transit Co., Ltd
Termini
Stations33
Service
TypeRapid transit
SystemSuzhou Rail Transit
Operator(s)Suzhou Rail Transit Co., Ltd
Technical
Line length29.6 km
Track gauge1,435 mm (4 ft 8+12 in)

Line 7 of Suzhou Rail Transit is a rapid transit line in Suzhou. Construction started on December 25, 2019.[1] The line will be 29.6 kilometers long.[1]

According to the plans, the part of Line 4 between Hongzhuang and Muli stations will be operated as part of Line 7.[2] This section started its operation since 15 June 2017, and splitted from line 4 in 10 October 2024.[3] The combined line will be 40.6 km long. In addition, a 4-station, 7.11 km northern extension from Moyang to Chunqiu Road started construction in May 2022, for an opening in 2026.

It has Tian'edang Yard (Chinese: 天鹅荡停车场) in use for Line 4.[4]

Stations

[edit]
Station name[5] Connections Distance
km
Location
English Chinese
Moyang 莫阳 - 0 Xiangcheng
Zhujing 朱泾
Suzhou North Railway Station 高铁苏州北站  2 
Xuenan 雪南
Changlou 常楼
Dengyun 登云
Litanghelu 蠡塘河路
Chunshenhudonglu 春申湖东路
Huayuanlu East 华元路东
Baidang North 白荡北  8 
Baidang South 白荡南 SIP
Banjing 板泾
Yangjing 洋泾
Jicuiqiao 积翠桥
Central Park 中央公园  1 
Reyunqiao 惹云桥  6 
Huangtiandang 黄天荡  5 
Loufeng 娄葑
Qunli 群力
Tongyuanlu South 通园路南  3 
Linjiatan 林家潭 Wuzhong
Guoxiang 郭巷  2 
Yinshan 尹山
Jinjiaqiao South 金家桥南
Fengjinlu 枫津路
Hongzhuang 红庄  4 
Lishu 蠡墅
Shihu Moshe 石湖莫舍
Yuexi 越溪
Wenxi Lu 文溪路
Tian'edang Lu 天鹅荡路
Suzhouwan North 苏州湾北
Muli 木里

Rolling stock

[edit]
Fleet numbers Year Built Time in service Builder Class Number in service No
of
car
Assembly Rolling stock Number Depots Line assigned Notes
396 (66 sets) 2023-2025 (planned) N/A CRRC Nanjing Puzhen B Never built 6 Tc+Mp+M - M + Mp+Tc PM227 070101-076606
(0701-0766)
None  7  (planned) The order scrapped in February 2023.
300 (50 sets) 2023-2025[a] 2024-present CRRC Nanjing Puzhen B 132 (22 sets) 6 Tc+Mp+M - M + Mp+Tc PM259 070101-075006
(0701-0750)
Tian'Edang Yard
Songling Depot
Yuanhe Yard
 4   7  Converted from PM101, PM102 and PM116.

References

[edit]
  1. ^ a b "苏州轨道交通7号线开工建设". 2019-12-25.
  2. ^ "苏州轨道交通". Archived from the original on 2012-07-13. Retrieved 2012-06-29. (Website of the subway operator "SZ-Transit" (苏州轨道交通/Suzhou Guidao Jiaotong) (information retrieved on Oct. 16th, 2010))[dead link]
  3. ^ "提前感受7号线!4号线支线正式并入7号线,接驳服务给力~". 苏州轨道交通. 2024-10-11. Retrieved 2024-10-16. 今天,有不少乘客发现原来4号线支线列车内车门上方的线路信息已变成紫色的7号线
  4. ^ 顾蕾 (2012-02-10). 苏州轨交4号线及支线今年6月动工. 苏州日报 (in Chinese). Archived from the original on 2012-07-14. Retrieved 2012-06-19.
  5. ^ "官宣!苏州轨道交通6、7、8号线车站站名定了". 2024-01-24.
  1. ^ Cars modified under project PM259.